Work continues on the excavation for, and forming of, a retaining wall on the west side of the Janet Sinegal Patient Care Building. It is scheduled to be completed by Jan. 13, 2012. 

In keeping with the natural elements around the hospital, the wall will have an embossed design in the concrete. There will be an area for plantings between the retaining wall and the existing offices on the ground level of the Train zone, so over time the wall will be obscured by plants that grow over it.