You may be scratching your head at the unusual orange structure rising from the Building Hope construction site. The structure will house a new site elevator. The elevator will transport people between Building Hope’s inpatient parking area and the existing Giraffe entrance – the front door to the entire hospital. We expect to finish work by the end of October – including covering the current orange exterior with the same zinc panels used on the Building Hope exterior.

Questions?  Please call:

Information: 206-987-6197

24-Hour Emergency Hotline:
Sellen Construction
Tim McKey
Project Superintendent
206.971.3316