Weather permitting, repair work will be completed this Saturday, Nov. 7 at the loading dock drive aisle on the north side of the building in the Mountain zone. This work will include filling existing holes with gravel and covering with asphalt. The repairs are scheduled to take place between 9 a.m. and 4 p.m., and will generate some noise. If you have any questions or concerns, please call the construction pager at 206-469-5860. Thank you for your patience.