Modular buildings located on Seattle Children’s hospital campus are being removed in sections via Penny Drive. Work to prepare for removal will take place between June 11 and 23: Monday through Friday, from 7 a.m. to 6 p.m.; Saturday, from 9 a.m. to 6 p.m.; no work will take place on Sunday. No work causing any noise will occur after 5 p.m. or before 8 a.m. weekdays, or after 5 p.m. or before 9 a.m. Saturdays.

The physical move of modular sections down Penny Drive will take place two to three times each day: 1:30 p.m. on Thursdays, Fridays and Saturdays only; and 6 and 8:30 p.m. Mondays through Saturdays. Transporting modular sections down Penny Drive should not cause significant delays, but if we experience traffic congestion, the Ocean garage exit to NE 45th Street may be opened for a brief time to prevent delays to patient and family departures.

For questions or concerns, please email [email protected].