Modular buildings located on Seattle Children’s hospital campus are being dismantled and removed in sections via Penny Drive from now through Aug. 20. The dismantling will take place Mondays through Fridays, from 9 a.m. to 6 p.m.; dismantling work will not occur on weekends.
The physical move of modular sections down Penny Drive will take place as follows: one at 1:30 p.m. and one at 7 p.m. Mondays through Fridays; and multiple moves from 8 a.m. to 8 p.m. Saturdays. No work will occur on Sundays. Transporting modular sections down Penny Drive should not cause significant delays, but if we experience traffic congestion, the Ocean garage exit to NE 45th Street may be opened for a brief time to prevent delays to patient and family departures.
For questions or concerns, please email [email protected].