A new drill rig will be delivered to the Building Care construction site and unloaded on Thursday, April 25 beginning at 5 a.m. The truck delivering the drill rig will enter and exit the site via the Sand Point Way construction entrance. This work is occurring early to minimize traffic impacts from the oversize load. Moderate noise will be generated during the unloading, but impacts to neighbors should be minimal because the unloading will take place within the fenced construction site. If you have questions, please call 206-987-8000 or email construction@seattlechildrens.org.