Archive for January 2021

Upcoming Building Care Construction Activities: Feb. 1 to Feb. 7

Building Care construction is underway. There will be ongoing construction activity at the hospital campus until the building opens in spring 2022. Seattle Children’s will publish a weekly post on this Construction Blog that outlines the work expected to occur the following week. We will also post to this blog whenever a construction activity will be especially impactful to neighbors.

From Feb. 1 to Feb. 7, construction crews are scheduled to perform the following activities:

  • Build out interior spaces
  • Framing
  • Paint
  • Install roofing
  • Install metal sheeting and panels
  • Install mechanical and electrical wiring and plumbing equipment
  • Remove scaffolding
  • Install drywall
  • Install elevator equipment
  • Install ceilings
  • Saw cut existing curb and demolish hard surfaces in north parking lot
  • Install flooring
  • Building connection work:
    • Install ceiling, utility wiring, and drywall on level 3 of River C
    • Paint and Install flooring on level 7 of River C
    • Excavation and form footings on level 1 of Forest A
    • Install metal panels and trim utility wiring on level 9 of Forest A

Construction noise will be generated throughout the week. Expect heavy truck traffic. The loudest external activities will be the saw cutting and demolishing on the north side of the construction site. Construction activity is weather-dependent and subject to change based on conditions.

All work will take place within standard construction hours: 8 a.m. to 6 p.m. Monday to Friday, and 9 a.m. to 6 p.m. on Saturday.

Please call 206-987-8000 or email [email protected] with questions.


Utility Work on Penny Drive and NE 50th Street

From Jan. 25 to Feb. 9 a crew will conduct utility potholing along Penny Drive and two locations on NE 50th St near 44th Ave NE. The work is being done to identify utilities under the roadways to support the design for the proposed Surgery Building and Parking Garage.

A vacuum truck and a small crew will work from 7 am to 3:30 pm each day. Construction noise will be generated off and on during this work; noisy activities will not begin before 8 am. Traffic control will be set up around the work zones.

On NE 50th St, the work will require taking one traffic lane to accommodate utility trucks in the street. Parking restrictions will be in place and flaggers will be present during the work to direct drivers and pedestrians around the work zones.

On Penny Drive, two-way traffic will be maintained when possible, but at times Penny Drive will be reduced to one lane. The Mountain Loading Dock, Ocean 7 Staff Entrance and Lot 4 will all be temporarily impacted during this work. Access to Lots 1, 2, 3 and 4 will be maintained at all times. Pedestrians and bikes will be rerouted. Please allow additional time for travel along Penny Drive during this work.

Please call 206-987-8000 or email [email protected] with questions.


Upcoming Building Care Construction Activities: Jan. 18 to Jan. 24

Building Care construction is underway. There will be ongoing construction activity at the hospital campus until the building opens in spring 2022. Seattle Children’s will publish a weekly post on this Construction Blog that outlines the work expected to occur the following week. We will also post to this blog whenever a construction activity will be especially impactful to neighbors.

From Jan. 18 to Jan. 24, construction crews are scheduled to perform the following activities:

  • Build out interior spaces
  • Framing
  • Paint
  • Install roofing
  • Install metal sheeting and panels
  • Install mechanical and electrical wiring and plumbing equipment
  • Install drywall
  • Install siding
  • Install elevator equipment
  • Install ceilings
  • Install soil and irrigation system
  • Install flooring
  • Building connection work:
    • Install flooring, trim utility wiring, install doors, and reposition infection prevention barriers on level 3 of River C
    • Remove infection prevention barriers on level 4 of River C
    • Remove infection prevention barriers on level 5 of River C
    • Demolish temporary staff entry vestibule and walls on level 1 of Forest A
    • Install expansion joint covers on level 9 of Forest A

Construction noise will be generated throughout the week. Expect heavy truck traffic. Construction activity is weather-dependent and subject to change based on conditions.

All work will take place within standard construction hours: 8 a.m. to 6 p.m. Monday to Friday, and 9 a.m. to 6 p.m. on Saturday.

Please call 206-987-8000 or email [email protected] with questions.


Upcoming Building Care Construction Activities: Jan. 11 to Jan. 17

Building Care construction is underway. There will be ongoing construction activity at the hospital campus until the building opens in spring 2022. Seattle Children’s will publish a weekly post on this Construction Blog that outlines the work expected to occur the following week. We will also post to this blog whenever a construction activity will be especially impactful to neighbors.

From Jan. 11 to Jan. 17, construction crews are scheduled to perform the following activities:

  • Build out interior spaces
  • Framing
  • Paint
  • Install roofing
  • Install windows
  • Install metal sheeting and panels
  • Install mechanical and electrical wiring and plumbing equipment
  • Install drywall
  • Install siding
  • Install elevator equipment
  • Install ceilings
  • Build out electrical, mechanical, and telecommunication rooms
  • Install flooring
  • Building connection work:
    • Framing and install utility writing, sprinklers, ceiling, flooring, and drywall on level 3 of River C
    • Remove infection prevention barriers on level 6 of River C
    • Install infection prevention barriers and demolish temporary staff entry vestibule on level 1 of Forest A

Construction noise will be generated throughout the week. Expect heavy truck traffic. Construction activity is weather-dependent and subject to change based on conditions.

All work will take place within standard construction hours: 8 a.m. to 6 p.m. Monday to Friday, and 9 a.m. to 6 p.m. on Saturday.

Please call 206-987-8000 or email [email protected] with questions.