There will be ongoing construction activity for Building Care at the hospital campus until the building opens in spring 2022. Seattle Children’s will publish a weekly post on this Construction Blog that outlines the work expected to occur the following week. We will also post to this blog whenever a construction activity will be especially impactful to neighbors.
From June 14 to June 20, construction crews are scheduled to perform the following activities:
- Build out interior spaces
- Paint
- Waterproofing
- Install and trim mechanical and electrical wiring and plumbing equipment
- Install ceilings
- Install flooring
- Excavation
- Pour concrete walkways and stairs
- Grading
- Restore rain garden
- Install soil and mulch
- Install irrigation
- Building connection work:
- Install utility wiring and brackets on level 3 of River C
- Set up infection prevention barriers and demolition on level 7 of River C
- Paint and install corner guards on level 1 of Forest A
Construction noise will be generated throughout the week. The mulch installation will generate some odors. Expect heavy truck traffic. Construction activity is weather-dependent and subject to change based on conditions.
All work will take place within standard construction hours: 8 a.m. to 6 p.m. Monday to Friday, and 9 a.m. to 6 p.m. on Saturday.
Please call 206-987-8000 or email [email protected] with questions.