There will be ongoing construction activity for Building Care at the hospital campus until the building opens in spring 2022. Seattle Children’s will publish a weekly post on this Construction Blog that outlines the work expected to occur the following week. We will also post to this blog whenever a construction activity will be especially impactful to neighbors.

From July 12 to July 18, construction crews are scheduled to perform the following activities:

  • Build out interior spaces
  • Paint
  • Install and trim mechanical and electrical wiring and plumbing equipment
  • Install ceilings
  • Install flooring
  • Pour concrete sidewalk and footings
  • Repair existing concrete
  • Plant landscaping
  • Install irrigation system
  • Restore rain garden
  • Install wood deck
  • Install concrete tile wall
  • Building connection work:
    • Install flooring, wall coverings, and ceilings on level 3 of River C
    • Move infection prevention barriers, demolish ceilings and flooring, framing, install drywall, and paing on level 1 of Forest A
    • Clean and remove infection prevention barriers on level 3 of Forest A
    • Clean and remove infection prevention barriers on level 4 of Forest A
    • Install door controls, clean, and remove infection prevention barriers on level 5 of Forest A
    • Install door controls, clean, and remove infection prevention barriers on level 6 of Forest A
    • Install doors and controls on level 7 of Forest A
    • Set up infection prevention barriers, install doors, and remove ceiling grid on level 8 of Forest A
    • Set up infection prevention barriers and install doors on level 9 of Forest A

Construction noise will be generated throughout the week. Expect heavy truck traffic. Construction activity is weather-dependent and subject to change based on conditions.

All work will take place within standard construction hours: 8 a.m. to 6 p.m. Monday to Friday, and 9 a.m. to 6 p.m. on Saturday.

Please call 206-987-8000 or email construction@seattlechildrens.org with questions.