There will be ongoing construction activity for Building Care at the hospital campus until the building opens in spring 2022. Seattle Children’s will publish a weekly post on this Construction Blog that outlines the work expected to occur the following week. We will also post to this blog whenever a construction activity will be especially impactful to neighbors.

From Aug. 2 to Aug. 8, construction crews are scheduled to perform the following activities:

  • Restore sidewalks on Sand Point Way (see separate July 26 Construction Blog post for details of this work)
  • Build out interior spaces
  • Paint
  • Elevator commissioning
  • Install flooring
  • Install soil and mulch
  • Plant landscaping
  • Install irrigation system
  • Install signs
  • Install steel structure at parking ramp canopy
  • Install wood deck
  • Building connection work:
    • Install flooring, ceilings, doors, wall coverings, and utility wiring on level 3 of River C
    • Remove infection prevention barriers on level 6 of River C
    • Paint and install ceilings, utility wiring, and signs on level 1 of Forest A
    • Install ceiling and clean on level 8 of Forest A

Construction noise will be generated throughout the week. Expect heavy truck traffic. Construction activity is weather-dependent and subject to change based on conditions.

All work will take place within standard construction hours: 8 a.m. to 6 p.m. Monday to Friday, and 9 a.m. to 6 p.m. on Saturday.

Please call 206-987-8000 or email [email protected] with questions.