Upcoming Building Care Construction Activities: April 26 to May 2

There will be ongoing construction activity for Building Care at the hospital campus until the building opens in spring 2022. Seattle Children’s will publish a weekly post on this Construction Blog that outlines the work expected to occur the following week. We will also post to this blog whenever a construction activity will be especially impactful to neighbors.

From April 26 to May 2, construction crews are scheduled to perform the following activities:

  • Build out interior spaces
  • Remove scaffolding
  • Paint
  • Install metal sheeting and panels
  • Install and trim mechanical and electrical wiring and plumbing equipment
  • Install drywall
  • Install ceilings
  • Install flooring
  • Form and pour concrete slabs, stairs, and walkway
  • Demolish asphalt and concrete
  • Excavation
  • Install oxygen line (near Emergency Department entrance)
  • Grading
  • Saw cut concrete and asphalt
  • Building connection work:
    • Demolish walls, floors, and ceilings; install utility wiring, windows, and siding on level 1 of Forest A

Construction noise will be generated throughout the week. The saw cutting and demolishing of asphalt and concrete will generate the most noise. Expect heavy truck traffic. Construction activity is weather-dependent and subject to change based on conditions.

All work will take place within standard construction hours: 8 a.m. to 6 p.m. Monday to Friday, and 9 a.m. to 6 p.m. on Saturday.

Please call 206-987-8000 or email construction@seattlechildrens.org with questions.


Upcoming Building Care Construction Activities: April 12 to April 18

There will be ongoing construction activity for Building Care at the hospital campus until the building opens in spring 2022. Seattle Children’s will publish a weekly post on this Construction Blog that outlines the work expected to occur the following week. We will also post to this blog whenever a construction activity will be especially impactful to neighbors.

From April 12 to April 18, construction crews are scheduled to perform the following activities:

  • Special note: On April 9, we will begin the first phase of reconfiguring the Emergency Department (ED) drop-off and drive aisle. The ED vehicular entrance will remain in the same location for now, but ED vehicles will no longer exit onto 40th Avenue NE; instead, they will be routed north through the hospital campus.
  • Build out interior spaces
  • Paint
  • Install metal sheeting and panels
  • Install and trim mechanical and electrical wiring and plumbing equipment
  • Install drywall
  • Install ceilings
  • Install flooring
  • Install roofing
  • Pressure washing
  • Form and pour concrete slabs, stairs, and walls
  • Demolish asphalt, concrete, lights, and signage at ED drop-off area
  • Install irrigation
  • Building connection work:
    • Paint; install doors and signage; and cleaning on level 3 of River C
    • Paint, install signage, move infection prevention barrier, and cleaning on level 7 of River C
    • Install seismic joint and fire proofing on level 1 of Forest A

Construction noise will be generated throughout the week. Expect heavy truck traffic. Construction activity is weather-dependent and subject to change based on conditions.

All work will take place within standard construction hours: 8 a.m. to 6 p.m. Monday to Friday, and 9 a.m. to 6 p.m. on Saturday.

Please call 206-987-8000 or email construction@seattlechildrens.org with questions.


Upcoming Building Care Construction Activities: April 5 to April 11

There will be ongoing construction activity for Building Care at the hospital campus until the building opens in spring 2022. Seattle Children’s will publish a weekly post on this Construction Blog that outlines the work expected to occur the following week. We will also post to this blog whenever a construction activity will be especially impactful to neighbors.

From April 5 to April 11, construction crews are scheduled to perform the following activities:

  • Special note: On April 8, we will begin the first phase of reconfiguring the Emergency Department (ED) drop-off and drive aisle. The ED vehicular entrance will remain in the same location for now, but ED vehicles will no longer exit onto 40th Avenue NE; instead, they will be routed north through the hospital campus.
  • Build out interior spaces
  • Framing
  • Paint
  • Install metal sheeting and panels
  • Install and trim mechanical and electrical wiring and plumbing equipment
  • Install drywall
  • Install ceilings
  • Install flooring
  • Pressure washing
  • Form and pour concrete slabs
  • Demolish temporary power switchboard and temporary duct bank
  • Building connection work:
    • Paint and install doors and glass on level 3 of River C
    • Install and trim utility wiring, and install ceiling on level 7 of River C
    • Demolish walls, floors and ceilings; install utility wiring; and install windows on level 1 of Forest A

Construction noise will be generated throughout the week. Expect heavy truck traffic. Construction activity is weather-dependent and subject to change based on conditions.

All work will take place within standard construction hours: 8 a.m. to 6 p.m. Monday to Friday, and 9 a.m. to 6 p.m. on Saturday.

Please call 206-987-8000 or email construction@seattlechildrens.org with questions.


Upcoming Building Care Construction Activities: March 29 to April 4

There will be ongoing construction activity for Building Care at the hospital campus until the building opens in spring 2022. Seattle Children’s will publish a weekly post on this Construction Blog that outlines the work expected to occur the following week. We will also post to this blog whenever a construction activity will be especially impactful to neighbors.

From March 29 to April 4, construction crews are scheduled to perform the following activities:

  • Build out interior spaces
  • Framing
  • Paint
  • Install roofing
  • Install metal sheeting and panels
  • Install mechanical and electrical wiring and plumbing equipment
  • Install drywall
  • Install ceilings
  • Install flooring
  • Pressure washing
  • Form and pour concrete curbs, slabs, and stairs
  • De-energize temporary power and remove temporary power poles (Seattle City Light)
  • Building connection work:
    • Install carpets and doors on level 3 of River C
    • Install wall coverings on level 7 of River C
    • Demolish walls, floors and ceilings; trim utility wiring; and install seismic joint, sheeting, and fireproofing on level 1 of Forest A

Construction noise will be generated throughout the week. Expect heavy truck traffic. Construction activity is weather-dependent and subject to change based on conditions.

All work will take place within standard construction hours: 8 a.m. to 6 p.m. Monday to Friday, and 9 a.m. to 6 p.m. on Saturday.

Please call 206-987-8000 or email construction@seattlechildrens.org with questions.


Upcoming Building Care Construction Activities: March 15 to March 21

There will be ongoing construction activity for Building Care at the hospital campus until the building opens in spring 2022. Seattle Children’s will publish a weekly post on this Construction Blog that outlines the work expected to occur the following week. We will also post to this blog whenever a construction activity will be especially impactful to neighbors.

From March 15 to March 21, construction crews are scheduled to perform the following activities:

  • Build out interior spaces
  • Framing
  • Paint
  • Install roofing
  • Install metal sheeting and panels
  • Install mechanical and electrical wiring and plumbing equipment
  • Install drywall
  • Install elevator equipment
  • Install ceilings
  • Install flooring
  • De-energize temporary electrical service and remove temporary power poles (Seattle City Light)
  • Demolish temporary duct bank and concrete pad
  • Install irrigation system
  • Form and pour concrete curbs, slabs, footings, and stairs
  • Building connection work:
    • Paint and install ceilings and flooring on level 3 of River C

Construction noise will be generated throughout the week. The loudest external activities will be the demolishing of the temporary duct bank and concrete pad. Expect heavy truck traffic. Construction activity is weather-dependent and subject to change based on conditions.

All work will take place within standard construction hours: 8 a.m. to 6 p.m. Monday to Friday, and 9 a.m. to 6 p.m. on Saturday.

Please call 206-987-8000 or email construction@seattlechildrens.org with questions.


Upcoming Building Care Construction Activities: March 8 to March 14

There will be ongoing construction activity for Building Care at the hospital campus until the building opens in spring 2022. Seattle Children’s will publish a weekly post on this Construction Blog that outlines the work expected to occur the following week. We will also post to this blog whenever a construction activity will be especially impactful to neighbors.

From March 8 to March 14, construction crews are scheduled to perform the following activities:

  • Build out interior spaces
  • Framing
  • Paint
  • Install roofing
  • Install metal sheeting and panels
  • Install mechanical and electrical wiring and plumbing equipment
  • Install drywall
  • Install elevator equipment
  • Install ceilings
  • Install soil
  • Install flooring
  • De-energize temporary electrical service and remove temporary power poles (Seattle City Light)
  • Excavation and grading
  • Install irrigation system and drains
  • Pour footings
  • Building connection work:
    • Install flooring and metal column covers on level 3 of River C
    • Fireproofing, demolish walls and ceilings, and install sheeting and seismic joints on level 1 of Forest A
    • Trim utility wiring on level 9 of Forest A

Construction noise will be generated throughout the week. Expect heavy truck traffic. The soil installation may generate moderate odors. Construction activity is weather-dependent and subject to change based on conditions.

All work will take place within standard construction hours: 8 a.m. to 6 p.m. Monday to Friday, and 9 a.m. to 6 p.m. on Saturday.

Please call 206-987-8000 or email construction@seattlechildrens.org with questions.


Upcoming Building Care Construction Activities: Feb. 22 to Feb. 28

There will be ongoing construction activity for Building Care at the hospital campus until the building opens in spring 2022. Seattle Children’s will publish a weekly post on this Construction Blog that outlines the work expected to occur the following week. We will also post to this blog whenever a construction activity will be especially impactful to neighbors.

From Feb. 22 to Feb. 28, construction crews are scheduled to perform the following activities:

  • Build out interior spaces
  • Framing
  • Paint
  • Install siding
  • Install roofing
  • Install metal sheeting and panels
  • Install mechanical and electrical wiring and plumbing equipment
  • Install drywall
  • Install canopy steel
  • Install elevator equipment
  • Install ceilings
  • Remove scaffolds
  • Demolish hard surfaces in north parking lot
  • Install irrigation
  • Form and pour bollard footings
  • Install flooring
  • Excavation and grading
  • Building connection work:
    • Paint and install utility wiring, flooring, and ceilings on level 3 of River C
    • Install ceilings and utility wiring on level 7 of River C
    • Framing and install sheeting, steel, and decking on level 1 of Forest A

Construction noise will be generated throughout the week. Expect heavy truck traffic. The loudest external activities will be the demolishing of hard surfaces on the north side of the construction site. Construction activity is weather-dependent and subject to change based on conditions.

All work will take place within standard construction hours: 8 a.m. to 6 p.m. Monday to Friday, and 9 a.m. to 6 p.m. on Saturday.

Please call 206-987-8000 or email construction@seattlechildrens.org with questions.


Upcoming Building Care Construction Activities: Feb. 15 to Feb. 21

There will be ongoing construction activity for Building Care at the hospital campus until the building opens in spring 2022. Seattle Children’s will publish a weekly post on this Construction Blog that outlines the work expected to occur the following week. We will also post to this blog whenever a construction activity will be especially impactful to neighbors.

From Feb. 15 to Feb. 21, construction crews are scheduled to perform the following activities:

  • Build out interior spaces
  • Framing
  • Paint
  • Install siding
  • Install roofing
  • Install metal sheeting and panels
  • Install waterproofing
  • Install mechanical and electrical wiring and plumbing equipment
  • Install drywall
  • Install canopy steel
  • Install elevator equipment
  • Install ceilings
  • Remove scaffolds
  • Remove construction hoist
  • Saw cut and demolish hard surfaces in north parking lot
  • Remove temporary utility poles, demolish temporary power switchboard, and demolish temporary duct bank and pad on west side of site
  • Install new soil
  • Form and pour footings
  • Install flooring
  • Building connection work:
    • Install flooring, drywall, and ceilings on level 3 of River C
    • Install ceilings and utility wiring on level 7 of River C
    • Install steel and decking, and form and pour footings on level 1 of Forest A
    • Install metal panels and trim utility wiring on level 9 of Forest A

Construction noise will be generated throughout the week. Expect heavy truck traffic. The loudest external activities will be the saw cutting and demolishing of hard surfaces on the north side of the construction site and the demolishing of temporary power components on the west side of the site. Construction activity is weather-dependent and subject to change based on conditions.

All work will take place within standard construction hours: 8 a.m. to 6 p.m. Monday to Friday, and 9 a.m. to 6 p.m. on Saturday.

Please call 206-987-8000 or email construction@seattlechildrens.org with questions.


Upcoming Building Care Construction Activities: Feb. 8 to Feb. 14

Building Care construction is underway. There will be ongoing construction activity at the hospital campus until the building opens in spring 2022. Seattle Children’s will publish a weekly post on this Construction Blog that outlines the work expected to occur the following week. We will also post to this blog whenever a construction activity will be especially impactful to neighbors.

From Feb. 8 to Feb. 14, construction crews are scheduled to perform the following activities:

  • Build out interior spaces
  • Framing
  • Paint
  • Install roofing
  • Install metal sheeting and panels
  • Install mechanical and electrical wiring and plumbing equipment
  • Install drywall
  • Install elevator equipment
  • Install ceilings
  • Demolish hard surfaces in north parking lot
  • Install flooring
  • Building connection work:
    • Paint and install ceiling and utility wiring on level 3 of River C
    • Install ceilings on level 7 of River C
    • Install steel and decking, and form and pour footings on level 1 of Forest A

Construction noise will be generated throughout the week. Expect heavy truck traffic. The loudest external activities will be the demolishing of hard surfaces on the north side of the construction site. Construction activity is weather-dependent and subject to change based on conditions.

All work will take place within standard construction hours: 8 a.m. to 6 p.m. Monday to Friday, and 9 a.m. to 6 p.m. on Saturday.

Please call 206-987-8000 or email construction@seattlechildrens.org with questions.


Upcoming Building Care Construction Activities: Feb. 1 to Feb. 7

Building Care construction is underway. There will be ongoing construction activity at the hospital campus until the building opens in spring 2022. Seattle Children’s will publish a weekly post on this Construction Blog that outlines the work expected to occur the following week. We will also post to this blog whenever a construction activity will be especially impactful to neighbors.

From Feb. 1 to Feb. 7, construction crews are scheduled to perform the following activities:

  • Build out interior spaces
  • Framing
  • Paint
  • Install roofing
  • Install metal sheeting and panels
  • Install mechanical and electrical wiring and plumbing equipment
  • Remove scaffolding
  • Install drywall
  • Install elevator equipment
  • Install ceilings
  • Saw cut existing curb and demolish hard surfaces in north parking lot
  • Install flooring
  • Building connection work:
    • Install ceiling, utility wiring, and drywall on level 3 of River C
    • Paint and Install flooring on level 7 of River C
    • Excavation and form footings on level 1 of Forest A
    • Install metal panels and trim utility wiring on level 9 of Forest A

Construction noise will be generated throughout the week. Expect heavy truck traffic. The loudest external activities will be the saw cutting and demolishing on the north side of the construction site. Construction activity is weather-dependent and subject to change based on conditions.

All work will take place within standard construction hours: 8 a.m. to 6 p.m. Monday to Friday, and 9 a.m. to 6 p.m. on Saturday.

Please call 206-987-8000 or email construction@seattlechildrens.org with questions.